Smithland Hydroelectric Power Plant, United States of America
Smithland, USA

  • Construction of a hydroelectric power plant with 3 horizontal bulb turbines and a total capacity of 72 MW
  • Reinforced concrete construction: 78 m long, 62 m wide, 32 m high
  • Massive component dimensions (slab thickness > 4.00 m)


CJ Mahan Construction Company, Grove City, OH

Lokasjon
  • ##project.benefits.item.headline##
    Saving of anchors through the use of the single-sided SCS climbing formwork
  • ##project.benefits.item.headline##
    Optimal adjustment of the supporting structures for all areas due to the high degree of flexibility of the VARIOKIT system components - from the units to the heavy-duty shoring tower
  • ##project.benefits.item.headline##
    Acceleration of the assembly and construction time on-site due to the pre-assembled formwork and scaffolding units
  • ##project.benefits.item.headline##
    Highest dimensional accuracy of the concrete structure through stationary prefabrication of the 3D formwork units

Prosjektet