Panama Canal, Panama
Panama, Panama

Two lock facilities (Gatun/Atlantic and Miraflores/Pacific) with three lock chambers created one after the other, each of which are 403 m long and 55 m wide; Lengths of the lock facilities: 1.8 km each for a total height difference of 26 m

  • construction period: 2011 - 2014
  • amount of concrete used: 6,600,000 m³
  • amount of steel used: 340,000 tons
  • area to receive formwork: 2,200,000 m²
  • 4,200 jobsite employees
  • 70 cranes and 30 concrete pumping stations


Grupo Unidos Por el Canal, SA (GUPC) Joint Venture:
Sacyr Vallehermoso, Spain; Impregilo, Italy; Jan De Nul, Belgium; Constructora Urbana, Panama

Lokasjon
  • ##project.benefits.item.headline##
    reduction of tie positions and, as a result, greater cost-effectiveness of the SCS climbing systems during single-face applications
  • ##project.benefits.item.headline##
    simple handling und carrying of high loads
  • ##project.benefits.item.headline##
    flexible adaptability to the structural geometry, which means that the working platforms are able to incline to a 15° and 30° angle as a result of the horizontal position of the platforms

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

With PERI we have found the right partner for our Panama Canal project. The PERI team developed a detailed technical solution for every lock component and provided superb support for our GUPC jobsite team.
José Pelaez
Site Manager Gatun/ Atlantic