Langen Foundation, Germany
Neuss-Hombroich, Tyskland

Construction period until opening: until 2004

Architect: Tadao Ando Architect & Associates, Osaka, Japan



Florack GmbH, Bonn

  • ##project.benefits.item.headline##
    outstanding concrete result
  • ##project.benefits.item.headline##
    no visible joint off-set

Prosjektet

Bilder fra prosjektprosessen
1 /
4

##project.requirementsAndSolutions.headline##

Krav eller utfordringer
predetermined plywood pattern
predefined quantity, position and distance of tie points
all corners with sharp edges
joint formation on equal areas, close formlining joints
use of SVB concrete with 100 kN/m² concrete pressure

Vis mer
Løsninger
VARIO GT 24 girder wall formwork with a special panel format screwed at the back
VARIO GT 24 girder wall formwork elements with 190 cm x 90 cm formwork panel and optically required six tie points per panel, partly as blind plug
utilisation of the fair-faced concrete coupling to reduce the joint off-set

Kundefordeler
outstanding concrete result
no visible joint off-set

Thomas Schieren
Foreman structural engineering
As we of course expected, we were able to achieve an excellent concrete result with the PERI formwork solution. We have been working with PERI for 20 years now and it has always served us well.

Relaterte produkter

    ##SalesContactsSectionHeadline##

    Ring oss gjerne på +47 32 20 49 40 eller kontakt en av våre selgere.