Foz Tua Dam, Portugal
Vila Real – Alijó, Portugal

Construction period: 2011 - 2016



Barragem de Foz Tua, ACE
Consortium of Mota-Engil S.A., Somague S.A. and MSF S.A

  • ##project.benefits.item.headline##
    Precise construction of the dam wall, the complex dam crest, the intake and discharge facilities and the tunnel for the hydraulic circuit
  • ##project.benefits.item.headline##
    Accelerated working through use of large climbing units with safe, convenient working platforms
  • ##project.benefits.item.headline##
    Best architectural concrete results with the project-specific, modified, extremely flexible VARIO GT 24 Wall Formwork
  • ##project.benefits.item.headline##
    Simplified site supervision thanks to continual coordination of all project participants and constant optimisation of material volumes on the construction site by the PERI Project Manager

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Paulo Libório
Site Manager
The support provided by the PERI design engineer directly on the jobsite along with the constant contact to his technical office ensured that all project members could work together in order to develop the best formwork solution for this complex project. Without this close collaboration, it would not have been possible to maintain the construction schedule. PERI ensured the best on-site formwork and project management through constantly adapted material quantities and schedules as well as close coordination with all construction crews for carrying out the wide range of formwork operations. This helped us to guarantee project profitability in terms of time and costs.