The so-called Audi tunnel, the line of the newly built ICE train connection between Nuremberg and Munich crosses a part of the company premises of the car manufacturer Audi underground. With respect to vibration-sensitive production plants, the idea of a mining-type blasting of the tunnel tube was no option. The construction was carried out with the cut-and-cover construction method instead. After the completion of the diaphragm walls and the bottom below ground, the outer tunnel walls were formed single-sided and concreted against the retaining walls.



ARGE Tunnel/Einführung Ingolstadt
Walter Bau-AG, together with DYWIDAG underground branch, Munich and Ed. Züblin AG, Munich

Lokasjon
Type prosjekt
Prosjekter
  • ##project.benefits.item.headline##
    Completion of the concreting segments according to schedule
  • ##project.benefits.item.headline##
    PERI tie brackets for efficient mounting of ties for the utilization of brace frames
  • ##project.benefits.item.headline##
    For each brace frame, there were two ties of the DW 26 system in order to safely support high loads (permissible load 2 x 250 kN)

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Relaterte produkter

##SalesContactsSectionHeadline##

Ring oss gjerne på +47 32 20 49 40 eller kontakt en av våre selgere.